Fiber Network Training and Consulting Services View Cart

About Us

Courses

Schedule

Catalog

Contact Us
 
 


Course Registration

Online Course Login

Fiber Optic Jobs
For Students


Financial Assistance

Local Discounted Hotels

FNT Archive

Press Releases

Fiber Optic Tools
& Supplies


 

Network Infrastructure Installer Course


Click here for schedule   Click here for class outline

This course is a must for the beginner technician or individual just entering the field of communications. The foundation of a solid network starts with quality, Standards compliant raceway installation. In this course, the student will learn important issues such as EMI/RFI separation requirements, support installation Codes and Standards, as well as how to effectively install fastening devices. This course also offers valuable tips and techniques for computer room floor installation, cable tray installation, conduit installation, bonding and grounding, and other types of raceway.

As a telecommunications and fiber optic technician, you are only as valuable as your knowledge regarding all aspects of dealing with network installation. Network Infrastructure Installer Installer gives you all the background and information you need for cabling preparation requirements; all in a easy to comprehend three day class with plenty of hands-on lab sessions.


NETWORK INFRASTRUCTURE INSTALLER CLASS

Class Outline:
Prerequisites - None
Tuition: $950.00
Duration - 24 hours (Three 8-hour days)
CEU Award - 2.0 semester credits
Certification - FNT

Network Infrastructure Installer Installer

  1. Introduction and Course Objectives

  2. Raceway Support Installation
    1. Conduit
    2. Tray
    3. Wireway
    4. Innerduct

  3. Raceway Installation
    1. Fixed
    2. Free air

  4. Wall Mount Rack Installation
    1. Supports
    2. Separation Requirements
    3. Grounding and bonding

  5. Floor Mount Rack Installation
    1. Concrete expansion anchors
    2. Bolting to raised floors
    3. Bonding and grounding

  6. Main Distribution Frame Installation
    1. Location and separation requirements
    2. Power requirements

  7. Telecommunications Boards
    1. Selection, preparation and mounting layouts
    2. Board component

  8. Wall Mount Interconnect Box Installation
    1. Wall anchors
    2. Locating studs
    3. Separation requirements
    4. Bonding and grounding

  9. Wall Mount MUTOA Installation
    1. Single gang box mount
    2. Mudring mount

  10. Modular Furniture MUTOA Installation
    1. Wireways
    2. Box location and mounting

  11. Power/Telecommunications Splice Case Pole Installation
    1. Guide wires
    2. Bonding and grounding
    3. Safety issues
    4. Cable service loops

  12. OSP Splice Case Burial Vault Installation
    1. Trench prep
    2. Extenders
    3. Drainage issues
    4. Vault types

  13. Rack Mount Equipment Installation
    1. Print reading
    2. Grounding and secondary isolation
    3. Basic cable dressing and identification practices


Return to top of page